Lane closures expected Oct. 13-16 during Alabama Power work
October 06 2025
AUBURN, Ala. - Alabama Power work is expected to take place from 8 a.m. to 4 p.m. on Oct. 13-16 in the following locations:
- Southbound lane of South Ross Street between Magnolia Avenue and East Thach Avenue.
- Eastbound lane of East Thach Avenue at the Chewacla Drive and South Ross Street intersection.
Intermittent lane closures are expected during the work, and traffic control measures will be in place to direct motorists around the closures. Drivers are advised to use caution in these areas.